• 4
  • The

    • Curing

  • The cuts gradually lose moisture, which aids their preservation. Curing is carried out in drying rooms in natural ambient conditions, with windows to the exterior, so that drying can be achieved in ideal conditions
  • Label / Approximate period: Black 432 days | Red 432 days | Green 288 days